BIM&CFD
BIM can improve the space management and the proportion of prefabrication. We use BIM for the whole process, from the conceptual model to the construction drawings. This includes detailing and part drawings.
CFD simulation technology is able to simulate the velocity, pressure and air age of air. It is able to validate the design, shorten the validation period and make the design more reliable.
BIM
Use BIM to find any interference parts, improve construction quality, increase the prefabrication ratio, and shorten the project duration.
Business
Our quality assurance product assured selection
項(xiàng)目內(nèi)容:潔凈板安裝,2000平方米地點(diǎn):南京時(shí)間:2020
詳情項(xiàng)目內(nèi)容:設(shè)計(jì)及施工,250平方辦公室裝修地點(diǎn):上海時(shí)間:2022
詳情項(xiàng)目內(nèi)容:設(shè)計(jì)及施工,8000平方米廠房1600平方米辦公室裝修地點(diǎn):常熟時(shí)間:2021
詳情項(xiàng)目內(nèi)容:設(shè)計(jì),8000平方米廠房1600平方米辦公室裝修地點(diǎn):嘉興時(shí)間:2021
詳情項(xiàng)目內(nèi)容:EPC總包,2000平方米地點(diǎn):南京時(shí)間:2020
詳情項(xiàng)目內(nèi)容:EPC總包,2000平方米千級(jí)凈房地點(diǎn):天津時(shí)間:2021
詳情項(xiàng)目內(nèi)容:EPC總包,1000平方米千級(jí)凈房地點(diǎn):蘇州時(shí)間:2020
詳情項(xiàng)目內(nèi)容:設(shè)計(jì),8000平方米萬級(jí)凈房地點(diǎn):常熟時(shí)間:2020
詳情項(xiàng)目內(nèi)容:EPC總包,3000平方米千級(jí)凈房地點(diǎn):嘉興時(shí)間:2020
詳情項(xiàng)目內(nèi)容:潔凈板安裝施工,3000平方米凈房地點(diǎn):南京時(shí)間:2022
詳情項(xiàng)目內(nèi)容:潔凈板安裝施工,3000平方米凈房地點(diǎn):蘇州時(shí)間:2022
詳情項(xiàng)目內(nèi)容:潔凈板安裝施工,6500平方米凈房地點(diǎn):南京時(shí)間:2021
詳情項(xiàng)目內(nèi)容:EPC,8000平方米廠房及1600平方米辦公室裝修,醫(yī)療注塑行業(yè)地點(diǎn):太倉時(shí)間:2021
詳情項(xiàng)目內(nèi)容:EPC總包,3000平方米千級(jí)凈房地點(diǎn):南京時(shí)間:2022
詳情